project impact

Descendants is a 12-part suspended public-art installation for Mirvac at Harbourside. I developed the detailed installation methodology for lifting, fixing and commissioning each artwork: coordinating façade brackets, catenary cables, temporary hoisting assemblies and electrical connections across the site.

technical scope

Installation methodology · lift planning · catenary cable coordination · façade bracket detailing · electrical coordination · commissioning

year

2026

my role

Installation Designer

client

Mirvac

status

In progress

project outcome

Client facing installation methodology document to coordinate installation timelines, requirements & other trades prior to site mobilisation.

My contribution: provide design critique on 70% design to optimise for fabrication & installation efficiency. Provide detailed documentation of intended installation methodology & timeline to client & stakeholders.

Descendants
Descendants
Descendants
Descendants

Delivery challenge: the artwork is mounted in a 12m wide thoroughfare between buildings with connecting bridges between the two. The installation design must contend with finished flooring, facades & maintain minimum distances for ongoing maintenance to the building.